Friday, February 17, 2012
The Best Knee Pad for Flying
I was flying with a new first officer today and when we decided to rejoin from offshore to Kerteh International Airport using the ILS approach he took out a massive 10 pounder potential cockpit hazard out. It has been a long time since I last used a knee pad as most of the modern helicopters comes with a built in chart holder which is lighted. However if you insist to use a knee pad the design below is better than any knee pad purchased from Pilot s Shop. I borrowed this design from the US Army Aviators 38 th Group when they came for an audit of our Squadron way back in the early 80s
This looks simple enough. My mother in law sew this up for me about 30 years ago. Get some velcro, a transparent plastic and a bit of cloth from your old uniform will do. Even if you don't know how to sew it can still be done!
When it is done ( maybe about 10 minutes work) you just strap it on your knees and it is now a useful gadjet for flying. As there are no metal parts it will not affect your magnetic compass. There are also no rigid plates to obstruct the controls of the helicopter.
At the end of the flight all you have to do is to fold it like a small handkerchief and chuck it in the nav bag. The patent for this tool is still pending. However if you want to make one for yourself I can send you a detailed drawings and measurements....Just deposit RM 50 to my Maybank Account 8211969
Sunday, February 12, 2012
Reconditioning a 40 years old vintage racing bike
This old bicycle had been lying at the back of my parents' house for the last thirty odd years. My younger brother bought it second hand when he was in school and that was around 1980. When I was offered the bike I quickly took it and the deal was I will pay my brother RM 50 if I can rebuild the bike to a road worthy condition.

Upon arrival, I stripped the bicycle apart and gave it a good wash. It was a good thing that the bicycle was hung near the kitchen as the whole bicycle was greasy. this layer of oil actually prevented the bike from rusting. After that I sent the bike to my good friend's hop at Jaya Motors. His mechanic spent two days changing the list of consumable that I requested....tyres, tubes, cables, bearings brakes, lights grips etc. At the end of the day I was only charged RM 150 by my friend.. a really good deal as he only charged the items at cost. what are friends for?


Upon arrival, I stripped the bicycle apart and gave it a good wash. It was a good thing that the bicycle was hung near the kitchen as the whole bicycle was greasy. this layer of oil actually prevented the bike from rusting. After that I sent the bike to my good friend's hop at Jaya Motors. His mechanic spent two days changing the list of consumable that I requested....tyres, tubes, cables, bearings brakes, lights grips etc. At the end of the day I was only charged RM 150 by my friend.. a really good deal as he only charged the items at cost. what are friends for?
A lot of people in the shop was admiring the antiqued Shumano 600 ten speed racing gears. It is still good and looks like it will last another 100 years.
This is how the beauty looks like now. I have just done about 100 km riding the bike. it feels good and it is a fast bike to ride.
It is not the lightest bike around but I am happy with it. This is my bike No 4 at home. Next I will try and acquire a Surly Long Haul Trucker touring bike.. See I am happy with a RM 200 toy!
Monday, December 5, 2011
How Poor Is Poor?
I felt bad for they boys and next day I decided to buy some good food for them. The next time when you feel poor just remember how poor these boys are...both financially and spiritually.
.
Friday, November 11, 2011
Our Garden of Eden
Sunday, October 16, 2011
Building my First Watercraft
Actually this was not the first boat that I built. Much earlier when I was a cadet in the Royal Military College (1975) I was drafted into the watermanship club and part of the project was to build a fleet of kayaks for some open day in the college . The sickening thing was it had to be done in our "spare time" ..a commodity that we NEVER so it was done over a few Sundays. Ten years later one of my friends, Dicky Cheah showed me a similar plan for a "Cnavas covered " kayak. I borrowed the plans and traced the full sized bulkheads. At that time I did not even have a jig saw but I know of a Dr Wee who had one. So after seeing the plans he decided that he wanted one as well.
Over several evenings we cut the bulkheads and used cheap ceiling wood for making a basic frame. I got some old lorry canvas to be used as the skin of the kayak. Before long the kayak was ready. It was a very stable boat and I had a lot of fun with it.
Sometime I would carry a passenger in the boat too. The total cost of building that boat was probably less than RM 100. So boat building need not be complicated or expensive! Just the will to do it!
Over several evenings we cut the bulkheads and used cheap ceiling wood for making a basic frame. I got some old lorry canvas to be used as the skin of the kayak. Before long the kayak was ready. It was a very stable boat and I had a lot of fun with it.
Sometime I would carry a passenger in the boat too. The total cost of building that boat was probably less than RM 100. So boat building need not be complicated or expensive! Just the will to do it!Friday, September 30, 2011
Turning over the Second Hull
The second hull was actually completed sometime back but I was in no hurry to have it turned over as I was busy with the first hull.The opportunity to turn the hull came when I had a few workers coming over to paint my roof and to repair some section of the fence that had been damaged by the dogs.
With the help of the three workers and another 3 friends I decided to get the hull rolled over. First I had to start removing the supports for the bulkheads.
Removing the last few pieces of wood can be quite scarry as the hull can "move" slightly. If there were some external forces the hull can topple so removing the last two supports were risky and I decided that I have to do this dirty job.
I briefed the workers and positioned three men on each side. I was to be the cheer leader from the front. Emergency procedures were briefed to the workers. You can get hurt if you don't follow my advice!
I got them to lift the boat off the ground initially just to see how light it was. Indedd it was not too heavy!
Now..on my command roll the hull to my right. Steady...Ok ..Ok start rolling. It is an easy job..Steady...
Ok..now take a short rest. Already half done..
These two big planks that support the hull will be put to good use in some parts of the boat later. It is strong and mature wood.
Now just a bit more. we have to get the hull upright. Easy does it again..
Get ready...lift..

See..it is quite easily done. My designer says he turned over the hull with just three persons. It can be done but will require more effort.
With the approaching monsoon in a few week's time there is not much that I can do on the boat except for the smaller bits and pieces. Now just one more problem. I don't know if the low loader can come over to my house to get the boat to the river.If not I will have to look for a site near the river to start my assembly in a few month's time.
Thursday, September 22, 2011
Meeting some young Malaysian Bicycle Tourist
One of my hashing kaki Pretty Boy told me he is expecting some friends from KL who would be riding bicycles to Dungun from Chukai and asked if I would join them. Since it was my day off from flying I said I would lead them to Kijal following the coastal kampong road.
At the appointed time of 0630 hrs I met the group which consisted of two young men and three ladies. They came in all sorts of bikes ..from a folder to a genuine touring bike.
I liked the way they loaded their bicycles. This bicycle has just gone round the country in 63 days and the young man in this picture was the cyclist.
This is a properly equipped touring bike which the owner bought in China. He took the bike back to Malaysia and then did a 70 days cycling trip to Shanghai via Thailand and Loas. The bike looks good and it is inexpensive.
So I lead the pack through the backlanes of Chukai town and crossed the bridge to the Kemaman Supply Base through Teluk Kalong and finally to Kijal beach. The ride was nice and quiet.
In Kijal I took the group to a small village shop for Nasi Lemak and roti Chanai breakfast. I had to leave them on their own as I was expecting some government Safety Officer coming to do an inspection on my shop at 1030 hrs,
Subscribe to:
Posts (Atom)