According to the plan, at Station "0" the waterline is 300 mm up the nose and at Station "10" it is 40 mm below the transom. Using these as a guide I used a string to draw a line. This was then recchecked with the bulkhead measurements.
Using a marker pen a line is drawn following the string that is joined between the two points.
Then a leveller is used to check the level of the line..The ground which the hulls are sitting on is not perfectly flat.